Time  14 hours 48 minutes

Coordinates 586

Uploaded July 23, 2017

Recorded July 2017

-
-
3,926 f
374 f
0
1.0
2.0
4.03 mi

Viewed 1311 times, downloaded 44 times

near Kampong Bukit Karong, Kedah (မလေးရှား)

Rarely used trail. Damn steep when approaching the top e.i. from the height of 1030m to 1218m. Have to use rope and rope ladder at most of these points.
Photo

Check Point 1

Taken as the first check point just after the Tupah Loji area.
Photo

Huge rock beds.

Huge wall of rock beds along the Tupah River. The bed is on the left when moving upstream.
Photo

Batu putih

White rocks as if it was painted white. Sumtimes this white rocks are confusing, it looks like water flowing above a spread granite. There can see layers of quartz veins across the rocks.
Photo

Check Point 2

Beautiful and amazing water fall. 2 rivers join into one. Good to stop, to do camping and to swim. At this point too, there is another trail on the left to reach the peak of Kedah. The trail is in our plan for future trip.
Photo

Herba point

As we are moving away from the Tupah river, species of Eurycoma sp. encountered along the trail up to the roofing.
Photo

Luboq putaq

Wild boar pond. I do not how many of them drilling the soil. Lol!
Photo

Check Point 4

Moving away from the Tupah river and head towards the roofing.
Photo

Check Point 5

Start to feel the cool breeze.
Photo

Check Point 6

Another nice place for R&R.
Photo

Check Point 7

Getting higher.
Photo

Check Point 8

800m dpl.
Photo

Mossy

Mossy. Who say Jerai has no mossy?
Photo

Check Point 9

Last check point, managed to fix. The dark is coming...
Photo

Entah

Photo

Pasang lampu

It's time to light the Ultraman indicator and to get ready with the headlamp.
Photo

Night in the wild

Photo

Stuck for more than 2 hours

Appreciating the night view of Gurun and Bedong areas,
Photo

End Point

Managed to reach the peak at 1:30am.

Comments

    You can or this trail